Fall arrest systems

Fall safety bag installation, transportation and storage services

Fall safety bag installation, transportation and storage services

Contact Box

Fall Protection UK Ltd:
info@fallprotectionuk.co.uk

Alternatively if you would rather speak a Fall Protection UK Ltd representative call us now on: 07958 725434

Search

installation01.jpg
The Fall Protection System has been designed for use principally inside a building during construction, where the fall bags will be enclosed by walls or partitions.
Method Statements
Lorry Bags Method Statement PDF Print E-mail
Written by Administrator   
Wednesday, 16 April 2008 10:10

Where to use the Fall Protection System

The Lorry Bag is produced principally to offer protection to an individual in unloading a lorry, particularly when on, or above the load bed of the vehicle. It offers the potential of reducing the dangers of a fall by providing an energy absorbing area surrounding the vehicle.

Last Updated ( Thursday, 17 April 2008 10:52 )
Read more...
 
Fall Bags Method Statement PDF Print E-mail
Written by Administrator   
Wednesday, 16 April 2008 10:03

Where to use the Fall Protection System

The purpose of the Fall Protection System is to reduce the fall potential of personnel working at heights to less than two metres. The Fall Protection System has been designed for use principally inside a building during construction, where the fall bags will be enclosed by walls or partitions.

Last Updated ( Thursday, 17 April 2008 10:58 )
Read more...